Linden Park Phase II
Mid Ohio recently began replacement work on 50,000 feet of service line, moving over 2,000 gas meters from inside to outside of customer homes.

Ohio River Crossing
Job for West Virginia Oil/ Clearfield is now 50% complete.

NiSource
added Mid Ohio to its qualified vendor list, allowing us to bid on their transmission and compressor station work

Fiberspar
Mid Ohio Pipeline is certified for Fiberspar spoolable pipe installation, one of a handle of companies.

 
 
Traditional Installation Techniques

Traditional Installation Techniques Mid-Ohio is equally adept at utilizing cutting edge technology or relying upon traditional installation techniques to obtain the desired end results for our customers. We maintain a large fleet of equipment capable of open cutting, plowing, or trenching, so that we can quickly adjust to changing situations to use the piece of equipment perfectly suited for the conditions. Our experienced operators are DOT qualified in utility excavation and can rely upon decades of field experience to maintain the safest possible working environments.

 
 
 
 
Gas
Water
Sewer
Fiber
Oil

 
 
Traditional Installation Techniques
Direction Drilling
Mainline Insertion
Paving

 

 
HistoryEmploymentContactSafetyBay State
© 2009 Mid-Ohio Pipeline | 2270 Eckert Rd Lexington, Oh 44904