Linden Park Phase II
Mid Ohio recently began replacement work on 50,000 feet of service line, moving over 2,000 gas meters from inside to outside of customer homes.

Ohio River Crossing
Job for West Virginia Oil/ Clearfield is now 50% complete.

NiSource
added Mid Ohio to its qualified vendor list, allowing us to bid on their transmission and compressor station work

Fiberspar
Mid Ohio Pipeline is certified for Fiberspar spoolable pipe installation, one of a handle of companies.

 
 
Mainline Insertion

Mainline Insertion,Spoolable Mid-Ohio Pipeline is on the forefront of spool-able fiber reinforced pipe installation. Relying on technology developed over the last 20 years, Mid-Ohio works closely with spool-able manufacturers to provide turn-key installations of this fantastic new product, which features a HDPE carrier pipe reinforced by a fiberglass epoxy laminate. The fiber reinforced pipe is inserted into corroded existing steel lines, using the existing steel line as a sleeve instead of a carrier. Although the inserted pipe is obviously of a smaller diameter than the previous carrier, there is typically no loss of carrying capacity because the fiberglass reinforced pipe can comfortably handle higher operating pressures. We have concentrated on natural gas and oil gathering, rehabilitating miles of mainline in rugged terrain across the Midwest. Our close working relationship with the manufacturers and engineers experienced in mainline insertion make it easy for owners looking to design-build a system to upgrade their network.

Benefits of Fiber Reinforced Pipe:

  • No corrosion, even eliminates the need for corrosion inhibitors
  • Less Expensive than comparable mainline replacement
  • 10x Faster Installs drastically minimize line downtime, reducing extra expenses and loss of revenue normally incurred when lines are under repair
    • 2,000-6,000 feet a day achievable, depending on terrain
  • Learn about Fiberspar spool-able pipe technology here

 
 
 
 
Gas
Water
Sewer
Fiber
Oil

 
 
Traditional Installation Techniques
Direction Drilling
Mainline Insertion
Paving

 

 
HistoryEmploymentContactSafetyBay State