Linden Park Phase II
Mid Ohio recently began replacement work on 50,000 feet of service line, moving over 2,000 gas meters from inside to outside of customer homes.

Ohio River Crossing
Job for West Virginia Oil/ Clearfield is now 50% complete.

NiSource
added Mid Ohio to its qualified vendor list, allowing us to bid on their transmission and compressor station work

Fiberspar
Mid Ohio Pipeline is certified for Fiberspar spoolable pipe installation, one of a handle of companies.

 
 
Sewer

Sewer Pipe Mid-Ohio Pipeline have the project management skills, equipment, and employee capabilities to successfully complete large sewer projects that normally prove difficult because of project size, scope, and complexity. Transitioning a community or neighborhood from septic tanks to a pressurized sewer system is a complicated process. For example, the completed Shawnee Hills Waste Water Collection Project switched over 870 residential homes and commercial businesses from septic tanks to a pressurized sewer system utilizing grinder pumps to liquefy the waste and pressurize the line. In addition to the grinder pumps, over 38 miles of pipe were installed along with the construction of lift stations and a waste water treatment plant. These systems are gaining popularity across the country as EPA requirements become more stringent, providing a cost effective way to convert from septic to sewer in situations where gravity systems are cost prohibitive. Sewer Pipe

Learn more about pressure sewer systems utilizing grinder pumps

 
 
 
 
Gas
Water
Sewer
Fiber
Oil

 
 
Traditional Installation Techniques
Direction Drilling
Mainline Insertion
Paving

 

 
HistoryEmploymentContactSafetyBay State
© 2009 Mid-Ohio Pipeline | 2270 Eckert Rd Lexington, Oh 44904